EdgeCore Mesa campus, Arizona

Mesa, Arizona (Greater Phoenix); at least 450 MW critical load at full build across more than 3.1M sq ft. At the Jan 2024 financing: one operating building and two under construction, 206 MW.

Name
EdgeCore Mesa campus, Arizona
Location
Mesa, Arizona (Greater Phoenix); at least 450 MW critical load at full build across more than 3.1M sq ft. At the Jan 2024 financing: one operating building and two under construction, 206 MW.
Size
$1.9B loan + $235M ABS
Status
Steady